Energo Engineering Projects Limited is a renowned organization providing one stop engineering solutions & consultancy services to the clients.
 

Energo is a multi-disciplined engineering, management and construction company. We provide solutions for all the EPC related needs of a business. We have a rich experience in advising numerous clients on various decisions concerning EPC. Our extensive knowledge, professional know-how and latest technology have been a supporting force behind many successful ventures. We undertake following activities under Consultancy & Advisory Services.

 

Perform Achieve & Trade (PAT) Consultancy Services

Under the PAT scheme, Designated Consumers (DCs) are required to reduce their Specific Energy Consumption values within a period of 3 years (First PAT cycle period: April 2012 to March 2015).

Energo provides consultancy services aimed at helping the DCs in achieving the target SEC values. Exceeding the target SEC value qualifies the entity for Energy Saving Certificates (ESCerts) which can be traded and used for compliance purposes. Each ESCert is equivalent to 1 Metric Tonne of Oil Equivalent (MTOE). Non compliance in achieving the specified targets invites proportionate financial penalties.

Our PAT Consultancy Services include:

  • Baseline study
  • Detailed energy audit / Performance evaluation test
  • Implementation for performance improvement
  • Measurement & Verification

Salient features of PAT Consultancy Services:

  • Reduced Auxiliary Power Consumption – Use of new technologies enhances performance resulting in reduced auxiliary power consumption.
  • Improved Heat Rate – Retrofitting improved design ensures reduction of as Run Heat rate to the best possible heat rate achieved on same cycle design worldwide on same design
  • PAT Target - To meet or exceed PAT target by checking energy consumption
  • Availing ESCerts-Exceeding the target SEC value qualifies the unit for Energy Saving Certificates (ESCerts) which can be traded and used for compliance purposes

Major Works executed are:

Consultancy Services for EE R&M Job for Complete Power Plant
S. No. Project Unit Size Detail of Location Details of owner/EPC Contractor Status
1 Chandrapur Super Thermal Power Station 2x210 MW Chandrapur, Maharashtra MSPGCL Under Execution
2 Bhusawal Thermal Power Station 1x210 MW Bhusawal, Maharashtra MSPGCL Under Execution
3 Parli Thermal Power Station 1x210 MW Parli, Maharashtra MSPGCL Under Execution
Consultancy provided as owner’s engineers during P.G. Test
S. No. Project Unit Size Detail of Location Details of Owner/EPC Contractor. Status
1 Lanco Amarkantak Power Project 300 MW Amarkantak, Chattisgarh Lanco Infratech Limited Completed
2 Rosa Power Limited 2x300 MW Rosa, U.P. Reliance Power Limited Completed
3 Sagardigihi Thermal Power Project 300MW Sagardighi, West Bengal WPGDCL Completed
4 Hindustan Zinc Limited’s Captive Power Plant 2x80 MW Zawar Mines, Rajashtan HIndutan Zinc Limited Completed
5 Hindustan Zinc Limited’s Captive Power Plant 1x80 MW Dariba, Rajasthan HIndutan Zinc Limited Completed
Consultancy provided for various Water Treatment Plants, Boiler Island
S. No. Project Reference Scope Of Work Status
1 Renusagar Power Company Limited Detailed Design & Consultancy for Civil Works of Boiler, ESP, Fans, Duct Supports, Coal Mills, Control Room of ESP and Structural Designing and Detailing of Coal Bunker Completed
2 GGS VII, Kalol Gujarat , Complete Design Consultancy including Civil, Structural, Electrical & Mechanical portion of Oil Effluent Treatment Plant of 1000cum/day Completed
3 Pokharbal Water Treatment Plant Complete Structural Design Consultancy for Pokharbal Water Treatment Plant. Completed
4 Water Treatment Plant at Jamadoba Civil & Structural Consultancy Services for Six(06) M.G.D. Water Treatment Plant Completed
Consultancy provided Performance Evaluation Test (PET)
S. No. Project Reference Scope Of Work Status
1. Ghazlan, Qurrayah, Rabigh, Shoaiba, Riyadh Saudi Electricity Corporation along with M/s NTPC (India). Unit sizes varying from 260 MW to 623 MW Performance Evaluation test of (Boiler Steam Turbine by following procedure and guidelines of ASME-PTC for Steam Turbine and Boilers. Completed
2 MAHAGENCO Performance Evaluation test for baseline and equipment performance analysis for EE R&M project of Chandrapur Super Thermal Power Station, Unit – 1 (210 MW) Completed
3 MAHAGENCO Performance Evaluation test as per ASME-PTC for baseline and equipment performance analysis for EE R&M project of Chandrapur Super Thermal Power Station, Unit –1,2 (2 X 210 MW) Completed
4 MAHAGENCO Performance Evaluation test as per ASME-PTC for baseline and equipment performance analysis for EE R&M project of Parli Thermal Power Station Unit – 2,3 (2 X 210 MW) Completed
5 Sterlite Industries, Vedanta Group Performance Evaluation Testing of Air cooled Condenser (ACC) 1 X 80 MW unit Completed
6 Aramco Overseas Company, Saudi Plants Energy Audit/Perfomance Evaluation of Saudi Aramco Cogen and Refinery Equipment Plants, 3 Plants Completed

Reduced Auxiliary Power Consumption

New technologies enhance performance resulting in reduced auxiliary power consumption.

Improved Heat Rate
Retrofitting with improved design ensures reduction of as Run Heat rate to the best possible heat rate achieved on same cycle design worldwide on same design.

PAT Target

To meet or exceed PAT Target in the form of specific energy consumption.

Availing ESCerts

Exceeding the SEC value results in issuance of Energy Saving Certificates (ESCerts) which can be traded and used for compliance purpose.